President Ibrahim Mohamed Solih has marked the completion of several infrastructure development projects carried out by his administration in Gemanafushi, Gaafu Alifu Atoll. The projects include the extension of the healthcare centre and the school’s 10-classroom extension, the water supply system, and an office of Fenaka Corporation Limited.
The newly inaugurated healthcare centre extension features an office, a public health unit, a conference room, a medical store, a general store, a garage, and laundry facilities. The project was contracted to Veeru Group Private Limited and is part of the administration’s efforts to improve healthcare services in the nation.
The water supply network project was contracted to Triveni Engineering and Industries Limited, while constructing the 10-classroom building, which sought to address space constraints at the school, was contracted to Swift Engineering Private Limited. In addition, the new Fenaka office is modern building with ample space for 30 employees.
Under President Solih’s leadership, the administration has made significant strides towards achieving equitable development across all inhabited islands in the Maldives. This includes enhancing the quality of life for citizens and empowering them to lead dignified lives. During his visits to various islands, President Solih is officially inaugurating the completion of numerous projects and services.